<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Control Applications &#187; Case Studies</title>
	<atom:link href="https://www.controlapplications.co.uk/category/case-studies/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.controlapplications.co.uk</link>
	<description>Just another WordPress site</description>
	<lastBuildDate>Wed, 22 Apr 2015 14:03:15 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>https://wordpress.org/?v=4.1.41</generator>
	<item>
		<title>Case Study 4 – Build Only</title>
		<link>https://www.controlapplications.co.uk/case-study-4-build-only/</link>
		<comments>https://www.controlapplications.co.uk/case-study-4-build-only/#comments</comments>
		<pubDate>Wed, 22 Apr 2015 14:00:13 +0000</pubDate>
		<dc:creator><![CDATA[ControlApplications]]></dc:creator>
				<category><![CDATA[Case Studies]]></category>

		<guid isPermaLink="false">http://www.controlapplications.co.uk/?p=90</guid>
		<description><![CDATA[<p>Control Applications also build sub contract panels, for a number of various companies, to their own design and specification. This is done on a labour only or a parts &#38; labour basis.</p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-4-build-only/">Case Study 4 – Build Only</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p><strong>Control Applications</strong> also build sub contract panels, for a number of various companies, to their own design and specification.<span id="more-90"></span></p>
<p>This is done on a labour only or a parts &amp; labour basis.</p>
<p><a href="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/Panel.jpg"><img class="aligncenter  wp-image-92" src="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/Panel.jpg" alt="Panel" width="613" height="301" /></a></p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-4-build-only/">Case Study 4 – Build Only</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.controlapplications.co.uk/case-study-4-build-only/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Case Study 3 – Assembly &amp; Inspection Rig</title>
		<link>https://www.controlapplications.co.uk/case-study-3-assembly-inspection-rig/</link>
		<comments>https://www.controlapplications.co.uk/case-study-3-assembly-inspection-rig/#comments</comments>
		<pubDate>Wed, 22 Apr 2015 13:58:36 +0000</pubDate>
		<dc:creator><![CDATA[ControlApplications]]></dc:creator>
				<category><![CDATA[Case Studies]]></category>

		<guid isPermaLink="false">http://www.controlapplications.co.uk/?p=87</guid>
		<description><![CDATA[<p>Another example of our complete package, again to tight time scales that were customer led, this time for the car industry. This particular system is for car door panels and takes the operator step by step through an assembly process with a vision system which then validates the correct operation to be carried out. The [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-3-assembly-inspection-rig/">Case Study 3 – Assembly &#038; Inspection Rig</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p>Another example of our complete package, again to tight time scales that were customer led, this time for the car industry.<span id="more-87"></span></p>
<p><a href="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/2015-04-22_14h58_11.png"><img class="aligncenter size-full wp-image-88" src="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/2015-04-22_14h58_11.png" alt="2015-04-22_14h58_11" width="288" height="358" /></a></p>
<p>This particular system is for car door panels and takes the operator step by step through an assembly process with a <strong>vision system</strong> which then validates the correct operation to be carried out. The operator selects the variant to be built and the <strong>H.M.I.</strong> takes them through the build process, guiding the operator as to the correct component and colour to be fitted. As the various parts are fitted the system either confirms they are correct via the <strong>Vision</strong> system or by a handheld <strong>barcode reader</strong>. Once the door panel is fully assembled the system prints a batch label, complete with barcode, to enable identification when it is has been fitted to the end product.</p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-3-assembly-inspection-rig/">Case Study 3 – Assembly &#038; Inspection Rig</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.controlapplications.co.uk/case-study-3-assembly-inspection-rig/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Case Study 2 – Furnace Charging System</title>
		<link>https://www.controlapplications.co.uk/case-study-2-furnace-charging-system/</link>
		<comments>https://www.controlapplications.co.uk/case-study-2-furnace-charging-system/#comments</comments>
		<pubDate>Wed, 22 Apr 2015 13:57:15 +0000</pubDate>
		<dc:creator><![CDATA[ControlApplications]]></dc:creator>
				<category><![CDATA[Case Studies]]></category>

		<guid isPermaLink="false">http://www.controlapplications.co.uk/?p=82</guid>
		<description><![CDATA[<p>This project was under taken in less than 6 weeks at the customers request, it is a perfect example of how we can complete a system, from order to final installation in  very short time scales. Our team comes together from the  initial design, to program, then onto panel build and delivery and onsite installlation! [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-2-furnace-charging-system/">Case Study 2 – Furnace Charging System</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p>This project was under taken in less than 6 weeks at the customers request, it is a perfect example of how we can complete a system, from order to final installation in  very short time scales.</p>
<p>Our team comes together from the  initial design, to program, then onto panel build and delivery and onsite installlation!<span id="more-82"></span></p>
<p><img class="aligncenter size-full wp-image-83" src="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/2015-04-22_14h56_21.jpg" alt="2015-04-22_14h56_21" width="626" height="434" /></p>
<p>This control panel enables the flow of copper and brass ore into a furnace.</p>
<p>It consists of a Lift system, that raises the material up to high level vibrating conveyors which then transfers the ore to the top of the furnace.  As the ore is transferred, the weight is checked via a series of <strong>Dynamic scales</strong>.</p>
<p>This system communicates with the various control via <strong>Profinet.</strong></p>
<p>&nbsp;</p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-2-furnace-charging-system/">Case Study 2 – Furnace Charging System</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.controlapplications.co.uk/case-study-2-furnace-charging-system/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Case Study 1 – P.L.C. Upgrade</title>
		<link>https://www.controlapplications.co.uk/case-study-1-p-l-c-upgrade/</link>
		<comments>https://www.controlapplications.co.uk/case-study-1-p-l-c-upgrade/#comments</comments>
		<pubDate>Wed, 22 Apr 2015 13:51:03 +0000</pubDate>
		<dc:creator><![CDATA[ControlApplications]]></dc:creator>
				<category><![CDATA[Case Studies]]></category>

		<guid isPermaLink="false">http://www.controlapplications.co.uk/?p=75</guid>
		<description><![CDATA[<p>During early 2014, we received an order for one of the largest 1 off contracts we have undertaken : This was to upgrade an obsolete siemens S5-115 P.L.C. to a S7-1500. This project was completed in under three months and was a team effort from design to installation with minimum desruption to the customer as [&#8230;]</p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-1-p-l-c-upgrade/">Case Study 1 – P.L.C. Upgrade</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></description>
				<content:encoded><![CDATA[<p>During early 2014, we received an order for one of the largest 1 off contracts we have undertaken :<br />
This was to upgrade an obsolete siemens S5-115 P.L.C. to a S7-1500.<span id="more-75"></span><br />
This project was completed in under three months and was a team effort from design to installation with minimum desruption to the customer as we were able to work along side the existing sytem!</p>
<p>The P.L.C. controlled multiple conveyors &amp; weighing scales that guided a product through the initail stages of a process for a major retailer.<br />
This system controlls the production flow through a series of rails, depending upon their weight and grade, before releasing them to the next stage . It consists of multiple H.M.i’s and Barcode Readers to enable production staff to view any messages and to log the product information.</p>
<p><a href="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/2015-04-22_14h50_45.png"><img class=" size-full wp-image-76 alignleft" src="http://www.controlapplications.co.uk/wp-content/uploads/2015/04/2015-04-22_14h50_45.png" alt="2015-04-22_14h50_45" width="606" height="215" /></a></p>
<p>The post <a rel="nofollow" href="https://www.controlapplications.co.uk/case-study-1-p-l-c-upgrade/">Case Study 1 – P.L.C. Upgrade</a> appeared first on <a rel="nofollow" href="https://www.controlapplications.co.uk">Control Applications</a>.</p>
]]></content:encoded>
			<wfw:commentRss>https://www.controlapplications.co.uk/case-study-1-p-l-c-upgrade/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
